About Banyan Gold
Banyan Gold is a gold exploration company focused on projects in Yukon that have the geological potential, size of land package and proximity to infrastructure that is advantageous for a mineral project to have potential to become a mine. Our Yukon based projects, AurMac and Hyland Gold, both fit this model and our objective is to gain shareholder value by advancing projects in our pipeline.
The 9,230 ha Aurex-McQuesten Property lies in close proximity to both Victoria Gold’s Eagle Project and Alexco Resource’s Keno Hill Silver District and is highly prospective for structurally controlled, intrusion related gold-silver mineralization in relation to the Tombstone intrusive suite. The property hosts numerous known gold targets and Banyan has developed a mineralization model at the McQuesten “Airstrip” Gold target, located adjacent to the main Yukon highway and just off the main access road to the Victoria Gold open-pit, heap leach Eagle Gold mine. The Property benefits from a 3-phase powerline, existing Yukon Energy Corp. switching power station and cell phone coverage. In 2019, Banyan carried out two phases of drilling and a further 10,000 metres in 2020 to rapidly advance this property.
The 2020 Initial Mineral Resource Estimate prepared in accordance with National Instrument 43-101 (“NI 43-101”) guidelines for the AurMac Property is 903,945 ounces of gold. It is a near surface, road accessible pit constrained Mineral Resource contained in two near/on-surface deposits: The Airstrip and Powerline deposits. The Mineral Resource is summarized in the table below.
AurMac Property Pit-Constrained Inferred Mineral Resources at a 0.2 g/t Au Cut-Off
Notes:
- The effective date for the Mineral Resource is May 25, 2020.
- Mineral Resources which are not Mineral Reserves do not have demonstrated economic viability. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.
- The CIM definitions were followed for classification of Mineral Resources. The quantity and grade of reported inferred Mineral Resources in this estimation are uncertain in nature and there has been insufficient exploration to define these inferred Mineral Resources as an indicated Mineral Resource and it is uncertain if further exploration will result in upgrading them to an indicated or measured Mineral Resource category.
- Mineral Resources are reported at a cut-off grade of 0.2 g/t Au, using a US$/CAN$ exchange rate of 0.75 and constrained within an open pit shell optimized with the Lerchs-Grossman algorithm to constrain the Mineral Resources with the following estimated parameters: gold price of US$1,500/ounce, US$1.50/t mining cost, US$2.00/t processing cost, US$2.50/t G+A, 80% heap leach recoveries, and 45° pit slop.
- Mineral Resource Estimate prepared in accordance with 43-101 guidelines by Marc Jutras, P.Eng., M.A.Sc., Principal, Ginto Consulting Inc, with technical report filed July 7,2020.
The Hyland Gold Project, located 70km NE of Watson Lake, Yukon, along the southeast end of the Tintina Gold Belt is a sediment hosted, structurally controlled, intrusion related gold deposit, with a large land package (over 125 sq. km), with the resource contained in the Main Zone area (900x600m) daylighting at surface and numerous other known surface gold targets. The Main Zone oxide zone is amenable to heap leach open pit mining, with column leach recoveries of 86%. The project has an existing gravel access road.
The Hyland Main Zone Indicated Gold Resource Estimate, prepared in accordance with NI 43-101, at a 0.3 g/t gold equivalent cutoff, contains 8.6 million tonnes grading 0.85 g/t AuEq for 236,000 AuEq ounces with an Inferred Mineral Resource of 10.8 million tonnes grading 0.83 g/t AuEq for 288,000 AuEq ounces.
(1) Mineral resources which are not mineral reserves do not have demonstrated economic viability. All figures are rounded to reflect the relative accuracy of the estimate.
(2) Mineral resources are reported at a cut-off grade of 0.3 g/t AuEq. AuEq grade is based on $1,350.00/oz Au, $17.00/oz Ag and assumes a 100% recovery. The AuEq calculation does not apply any adjustment factors for difference in metallurgical recoveries of gold and silver. This information can only be derived from definitive metallurgical testing which has yet to be completed.
Banyan trades on the TSX-Venture Exchange under the symbol “BYN”. For more information, please visit the corporate website at www.BanyanGold.com or contact the Company.